A practical guide to defining software work and preparing the right spare-parts enquiry for a planned shutdown.
Confirm the installed release, licence position and recovery plan before booking the upgrade. If the same shutdown needs hardware, identify each complete part number and revision separately. This gives engineering a defined change scope and purchasing a usable parts list.

A System 1 screen may still look normal when its release needs a support review. Treat the support date as a planning checkpoint alongside the condition of the server, database and operating system. Today's screen alone cannot tell you whether an upgrade can wait.
Keep these as separate lines in the project scope. A hardware quotation should make clear which items are included; arrange software licensing and migration work with the relevant provider.
Bently Nevada's November 2025 v25.2 release notes list the following support dates. Use this dated matrix with the documentation for your installation; it is not presented as the latest schedule.
| System 1 release | Published end of support |
|---|---|
| 24.1 | May 2026 |
| 24.2 | November 2026 |
| 25.1 | May 2027 |
| 25.2 | November 2027 |
The notes distinguish two events: unsupported releases retain assistance for common FAQ-type questions without engineering escalation; a subscription past its grace period stops data and alarm-event collection until renewal.
Planning implication: check support, licence renewal and infrastructure retirement separately. Booking an upgrade does not resolve an earlier renewal deadline.
Each upgrade consumes engineering time and introduces a change to validate. Waiting for a server failure can combine hardware recovery, compatibility work and historical-data access into one urgent job. Set the timing against the next planned site change and the required operating period.
For a multi-server installation, record which servers acquire data, replicate it and provide client access. Ask the upgrade provider to confirm the intended version relationships and licence requirements. A successful installation on one server does not demonstrate that the complete data path works.
Use this checklist to gather information. It is a planning aid; the migration method still needs approval for the actual installation.
For the documented move to System 1 25.1 or later, PostgreSQL 14 databases must move to PostgreSQL 17. Reverting the installation requires the specified VSS/Acronis backup, rather than simply uninstalling the upgrade.
A backup file alone does not show that the required environment can read it or that it contains the latest configuration and required history. Ask for a recovery rehearsal that demonstrates usable information, with a clear decision point for restoring service.
Allow for the database transition, validation and recovery decision in the maintenance window. Include database size, storage performance, backup location and connected or replicated servers in the estimate. The installer running quickly does not establish the duration of the complete change.
Before approving the quotation, ask: who performs each task, what is excluded, and what evidence will show the work is complete?
Bently Nevada describes a natural-gas operator that moved selected critical assets to System 1 20.1 in mid-2020 and added Decision Support Analytics. The analytics identified two wiring-related alarm conditions; the operator's asset team checked them in System 1. The reported result was a corrected probe installation and avoidance of unnecessary work, including in-situ balancing.
Planning lesson: define the diagnostic task you expect to improve, who reviews the findings, and how site acceptance will be demonstrated.
This is a manufacturer-reported customer story, not an EWOLO CONTROL project. It does not establish an outcome for another installation or replace release-specific migration instructions.
A software project can also uncover a hardware requirement: a revision differs from the drawing, a standby rack needs a spare, or the shutdown includes a component replacement. List each item separately so its responsibility and cost remain clear. Send a clear nameplate photo and the complete identifier. A series name such as “3500” is useful context, but it is not a complete ordering requirement.
If a replacement or alternative is proposed, ask for the matching evidence and the conditions that apply. Obtain site engineering approval before ordering against that proposal.
That symptom alone does not establish the protection status. Investigate the missing current data and have the responsible engineer assess the rack indications and protection functions using approved site procedures. Do not treat an unchanged software screen as proof that protection is either normal or failed.
Agree which historical records must remain available before work starts. Include representative history, new acquisition and relevant alarms in the acceptance checklist. Keep any unresolved history requirement open for the responsible engineer’s decision. Opening the application successfully does not demonstrate that engineers can retrieve the information needed for comparison or investigation.
Yes. Send the clearest available photos and explain which characters or revision details are missing. Keep the identification open until those details are confirmed; do not approve an order based only on a similar-looking item.
Ask for item-specific product, label and packaging photos, and written condition confirmation. Packaging appearance alone does not establish operating condition or test coverage.
No. Ask what was checked and request the relevant record where testing is claimed. Visual inspection, power-on checks, functional tests and system tests describe different scopes.
State the required-on-site date and destination at the start. Ask the quotation to distinguish item availability, dispatch timing and transport assumptions. Agree the delivery basis before placing the order.
Our supply policy is new, unused parts only. Item availability, delivery timing, documents and applicable warranty terms must be confirmed in the written quotation.
Scope note: This enquiry is for hardware sourcing. Confirm System 1 software licensing and migration scope with your relevant software provider.
[1] Bently Nevada, System 1 v25.2 What's New, document 125M6426, November 2025. Page 4: database transition, backup and subscription notes. Page 7: release support matrix.
Read the manufacturer release notes (PDF)
[2] Bently Nevada, Decision Support Analytics Achieve Value Realization on Day 1. Manufacturer customer story describing a mid-2020 System 1 20.1 project.
Read the manufacturer customer story
References reviewed 19 October 2026. The release notes and historical customer story have different scopes; confirm applicability to the actual installation.
No online payment is requested. Final price and terms are supplied in a written quotation.
Scan to Wechat :
Scan to WhatsApp :