ISO 9001:2015 certified industrial automation spare parts supplier

FAQs

Frequently asked questions

Find answers about identifying an automation part, placing an order and getting support after delivery.

Browse all questions

Prepare a quote your buyer can approve.

List each part number and quantity, the delivery destination and any paperwork your buyer needs. Use the written offer to check the terms line by line.

Identify the module before you order.

Compare the label, suffix and hardware revision with the installed unit. If a different revision is offered, check the manufacturer’s documentation before approving it.

Build a quotation for your customer.

Keep end-customer specifications and delivery dates beside each line. Flag any documentation, packaging or warranty requirements before you price the job.

Company & support

How do I reach the parts team?

Email unity@mvme.cn or contact us on WhatsApp at +86 18020776786. For an existing order, include the PI or invoice number so we can find the right record. Contact details

Where is EWOLO CONTROL based?

Our team is in Xiamen, Fujian, China. The Contact Us page has the office address and map. If you want to visit, contact us first to agree a time and what you would like to see. Office details

Which automation parts can I enquire about?

Browse the catalogue by product type or manufacturer. You can also send a list of PLC and DCS modules, HMI panels, turbine control cards or machinery monitoring parts for a model-by-model availability check. Browse products

Can you help with an existing order?

Reply to your order correspondence or use our enquiry form. Include your order reference, the affected line item and what you need, such as a tracking update, document or delivery discrepancy. Ask about an order

How do I arrange a call across time zones?

Send two possible times with your city or UTC offset, the topic and the best number to call. Wait for a confirmed time before inviting your colleagues.

Can our engineer join a video call to review a part?

Tell us which part you want to see and which details matter, such as the nameplate or connector. We can check whether the item is available to show and agree on a time.

How can I attach a parts list to my enquiry?

Use the attachment field on the contact form or email your list with the project reference in the subject. A spreadsheet with one part number and quantity per line is easiest to review.

What can I leave out of a nameplate photo?

Keep the manufacturer, complete ordering code and revision legible. Crop out customer names, site addresses, employee details and unrelated screens before sharing the photo.

I contacted you through two channels. How do I keep one enquiry?

Reply in the thread that already has your quote reference. Mention the other message and tell us which email address to use for the written offer.

Who should approve a part for use in our plant?

Your plant engineer or system integrator should approve suitability for the installed equipment. We can help you obtain the offered ordering code, available label photos and manufacturer references for that review.

Part numbers & documents

Which details identify the exact part?

Copy the entire manufacturer part number from the label, including dashes and suffixes. Add the series or revision if marked. A clear photo of the label and a second photo of the whole unit help distinguish similar modules.

What if the offered revision differs from mine?

Ask us to list both references and identify the difference in writing. Have your engineering team check the manufacturer’s compatibility information for the installed system before approving a change. Find technical documents

Where can I find a manual or datasheet?

Search Resources using the full part number. If the file is missing or covers a different revision, send the model, the document type and a label photo so we can check the available reference. Search Resources

Can I enquire about a discontinued or unlisted model?

Yes. Send the exact order code, quantity and destination. We will check what can be offered for that reference. If your project permits alternatives, specify which substitutions your engineer can approve.

How is the part condition confirmed?

Ask for the condition to be stated against each line of the quotation. If original seals, label photos or packaging are acceptance criteria, include them in the enquiry before you place the order.

The circuit board and enclosure show different numbers. Which should I quote?

Send photos of both labels and say whether you need the complete assembly or the internal board. A number printed on the board may identify a component within the assembly.

What if a character on the nameplate is unreadable?

Mark the unclear position with a question mark and send a second photo from another angle. An old purchase order or packing label can help resolve characters such as O and 0.

Does an ordering code cover a single module or a kit?

Ask for the contents to be listed against the exact code. Name any base, cable, terminal block or plug you expect to receive so it can be checked separately.

How do I tell whether a family manual covers my variant?

Check the manual's model list, suffix table and revision or edition. Send the document number and the page you are relying on if the exact ordering code is unclear.

How do I verify a manufacturer's replacement number?

Request the manufacturer's cross-reference or lifecycle notice covering both ordering codes. Have your engineer check any stated conditions before approving the change.

Purchasing & quotations

Can I send a mixed-brand parts list?

Yes. Put one full part number and quantity on each line. Add the manufacturer, required revision, delivery country and any deadline. Mark the items that are holding up your order. How to order

What should I check on my quotation?

Match every part number, suffix and quantity to your requisition. Check condition, currency, price, availability, dispatch estimate, freight, warranty and quote validity before issuing your purchase order.

What can I use for supplier approval?

Start with our Company Qualifications page. If your purchasing department needs a particular document or vendor form, send the checklist so we can confirm what is available. Company qualifications

How should I request repeat or scheduled quantities?

Include the earlier quotation or PI reference and the new quantities and dates. Ask for each release to be quoted separately if your buyer needs to compare price, freight and lead time by delivery.

When is my order ready for payment?

Review the pro forma invoice against your purchase order. Resolve any differences in model, quantity, price or delivery terms with our team and use the payment details on the confirmed invoice. Review the ordering steps

My quotation has expired. Can I still use its price?

Request a refreshed offer using the original quotation number. Check the revised price, availability, lead time and validity before issuing your purchase order.

How do I request an exact match while allowing optional alternatives?

Mark the original line as an exact-match request and ask for any alternative on a separate line. Identify the suffix or revision requirements that your engineering team cannot change.

What if our purchase order and your quotation disagree?

Identify the conflicting line and field, such as quantity, suffix or freight terms. Ask for corrected documents or written clarification before payment.

Does receiving a quotation reserve the stock for us?

If you need stock held during approval, ask for written confirmation of the quantity, expiry time and any conditions. Use those details when setting your internal approval deadline.

Is the quoted price per piece, per pair or per pack?

Check the unit of sale and number of pieces per pack on each line. If either is unclear, request both the unit price and the extended price for the quantity you need.

Engineering & inspection

Can I see labels or packaging before ordering?

Tell us exactly what your team needs to verify, such as the card revision, box label or connector face. We can discuss available photos or a product review for the quoted item. See customer inspections

Which checks take place before dispatch?

We check product identification, quantity, visible condition and packaging against the confirmed order. If you need a functional test or a particular inspection record, agree its scope with us before purchase.

My line is down. What should I send first?

Send the complete part number, a label photo, the quantity and the latest useful arrival date at your site. Include the destination so we can check an actual dispatch window and transport option.

What if the supplied unit does not work after installation?

Record the part number, serial number, symptoms and operating conditions. Use the manufacturer’s instructions for your revision and have the site’s qualified personnel handle equipment checks. Send the order reference and any diagnostic records to our team for review. Warranty process

What is the difference between a visual check and a functional test?

A visual check can document the label, connectors and visible condition. A functional test requires suitable equipment and a defined test scope. Ask which checks are available for the exact item.

Can we specify inspection acceptance criteria before buying?

Send a short checklist identifying the part, the evidence needed and who will approve it. Ask which items can be checked and get the agreed scope in writing before ordering.

Which photos help us compare two connector layouts?

Provide a straight-on view of each connector face and a wider view showing its position on the module. Keep the orientation consistent so your engineer can compare keys, positions and markings.

Is software or a licence included with a hardware module?

Identify the software version, licence or activation you need. Ask for each deliverable to be listed explicitly in the offer before assuming that hardware includes it.

Can I assume a replacement controller contains our application?

Record your backup and configuration requirements separately from the hardware order. Have your controls engineer confirm how the approved application will be restored before the replacement is installed.

What should I provide to check a module's supply rating?

Send the full ordering code, a clear rating-label photo and the installed system's specified supply. Ask your engineer to compare them with the manufacturer documentation for that variant.

Distributor enquiries

What should I include when quoting an end customer?

Send the full references, quantities and required delivery dates. Flag any customer requirements for condition, traceability or packaging so those items can be addressed in your written offer.

Can I compare several quantities for one model?

List each quantity separately and say whether you need one shipment or several. Ask us to identify the availability, freight and quotation validity for each option.

What information can I pass on to my customer?

Use the model-specific details and written terms from your quotation. For technical questions, request the manufacturer’s document for the exact revision. Ask us to confirm any end-customer warranty or documentation requirement in writing.

My customer changed a specification after the quote. What now?

Send the original quote reference and the revised line item. Ask for a revised offer before confirming the order, particularly if the suffix, quantity or ship-to location has changed.

How should I request pricing for several delivery destinations?

Group quantities by destination and give the country and postal code for each group. Request separate freight figures so you can compare delivered costs for each customer.

How should I set the validity of my resale offer?

Compare your customer's decision date with the expiry of our written offer. If your customer needs more time, request updated validity before committing your own terms.

Can I request neutral outer packaging for resale?

Describe the outer packing and markings your customer requires. Ask for written confirmation of feasibility before ordering, including any manufacturer or carrier markings that must remain.

May I share customer drawings for a parts enquiry?

Share only documents you are authorized to disclose. Crop to the component and revision needed for identification and remove unrelated project or personal details.

How do I present a partial quantity to my end customer?

Ask for the currently available quantity and the balance to be shown separately, each with its own timing. Get the customer's approval for a split before promising either shipment.

What should I retain for after-sales support on a resale order?

Keep the supplier invoice reference, the end customer's order line, the delivered part and serial numbers where available, and the delivery date. These identifiers help trace a claim back to the supplied unit.

Orders & delivery

When can an in-stock order ship?

For available stock, our usual dispatch target is 1–3 business days once the order is accepted, funds have cleared and agreed checks are complete. Ask about same-day dispatch on urgent lines. The date confirmed for your order takes priority. Shipping policy

Does the dispatch date mean the part will arrive that day?

Dispatch is when the shipment leaves for the carrier. Transit and customs clearance take additional time. Give us your destination and required arrival date so the transport estimate can be checked separately.

Can I use my own courier account?

Request this before dispatch and provide the carrier instructions. We will confirm whether the arrangement is available for the destination and shipment. Carrier options

What paperwork should I request for customs clearance?

Ask your broker what is needed for the destination. Send us the consignee details and document list before confirmation, and agree which invoices, packing details or other documents will accompany the shipment.

How do I track a shipment or report a delay?

Use the carrier reference provided after dispatch. If tracking stops updating, contact our team with your PI number, tracking reference and delivery deadline so we can check the shipment.

Can I change or cancel a confirmed order?

Contact us promptly with the order reference and affected lines. We need to check the written terms and whether sourcing or dispatch has already started. Special-order items can have cancellation restrictions. Review return conditions

How do I get carton dimensions and weight for a freight booking?

Ask whether the figures are estimates or final packed measurements. For collection, use the confirmed carton count, dimensions and gross weight so the carrier can accept the booking.

Can part of my order ship ahead of the balance?

Identify the lines and quantities you need first. Request written confirmation of availability, dispatch dates and additional freight before approving separate shipments.

What address details does the courier need for an industrial site?

Provide the consignee name, street address, postal code, country and a receiving contact. Add the gate, building or delivery-hours restriction if it affects access.

Only one carton from a multi-carton shipment arrived. What should I check?

Compare the delivered carton numbers with the packing list and tracking numbers. Ask whether the carrier has separate scans for the remaining cartons and report any discrepancy promptly.

Payment & invoices

Can I get a pro forma invoice?

Yes. Check the billing details, items, currency, freight charges, warranty, validity and payment instructions on the PI before arranging payment. Payment terms

Which payment method does EWOLO CONTROL accept?

Bank wire transfer (T/T) is the standard method. Use the account on the official invoice. As a rule, payment must clear in full before dispatch. The published policy excludes card payments and trade credit. Read the payment policy

Are freight and import charges included in the price?

Read the delivery term and named destination on your offer. Unless the quotation says otherwise, product pricing excludes freight, insurance, duties and taxes. Ask us to clarify the charge you are budgeting for before ordering. Shipping charges

What if the invoice has the wrong billing information?

Send the PI or invoice reference together with the exact legal name, address and any required tax identifier. Ask for the corrected document before you pay.

Can I pay in a currency different from the invoice?

USD is the default. CNY, EUR, GBP or HKD may be used only when expressly stated on the official quotation or invoice. Request a revised document before sending another currency.

Who covers intermediary-bank fees on a wire transfer?

The customer is responsible for bank fees, intermediary charges and conversion costs. Arrange the transfer so the full invoiced amount reaches EWOLO CONTROL.

I received new bank instructions by email. How do I verify them?

Stop before transferring funds and call the telephone number published on our website. Verify the change independently and pay only the account shown on the official EWOLO CONTROL invoice.

Does a transfer receipt mean payment has cleared?

A receipt shows that the payer initiated the transfer. Send the invoice reference and ask our team to confirm receipt of cleared funds before scheduling collection.

Can EWOLO CONTROL supply on open account or offer net-30 terms?

EWOLO CONTROL does not offer trade credit or deferred-payment facilities. Allow time for cleared funds when planning an order that needs internal purchasing approval.

Can we pay a deposit and settle the balance before dispatch?

The standard term is 100% cleared payment before dispatch. A split payment arrangement is available only if specifically approved in writing for the order.

Returns & warranty

How long is the warranty?

Eligible new and unused products normally carry a 12-month return-to-base warranty starting at dispatch. Check the quotation or order confirmation for the period that applies to the item. Coverage applies to verified defects under normal intended use. Warranty terms

What should I do if a delivery is damaged, short or incorrect?

Inspect the shipment on arrival. Record visible damage on the carrier receipt, keep the carton and label, and photograph the affected items. Notify us within five calendar days of delivery and include your order reference. Report a delivery issue

How do I obtain return authorization?

Send the invoice or order number, model, serial number if available, reason for return and supporting photos. Wait for written approval and an RMA number before sending the item. Follow the dispatch deadline and packing instructions in the authorization. Return instructions

What happens if a part fails shortly after delivery?

If a fault appears within 14 calendar days of delivery, contact us immediately. After an authorized return and inspection, an equivalent replacement takes priority. A refund may be offered if a suitable replacement is unavailable. Initial fault policy

When is an approved refund processed?

The usual processing window is 5–10 business days after inspection. Your bank may take additional time. Ask our team to confirm the amount and treatment of shipping or other charges for your particular return. Refund process

How soon must I dispatch an authorized return?

Dispatch the item within 14 calendar days after the RMA is issued. If you cannot meet the deadline, contact the team before shipping and ask for written instructions.

Where should I put the RMA number?

Put the authorization number on the outer shipping carton and include it in your correspondence. Leave the manufacturer's original packaging and product labels unmarked.

How should I pack an electronic module for an approved return?

Follow the RMA instructions, use suitable antistatic protection and cushion the module inside a sturdy outer carton. Include the accessories or documents requested for the review.

Does the warranty cover incorrect wiring or operation outside rated limits?

The warranty covers verified defects under normal intended use. Incorrect wiring or configuration, operation beyond manufacturer ratings, electrical damage and unauthorized alterations are excluded.

Will I be told if a warranty replacement has a different revision?

For a valid claim, any material difference in a proposed equivalent will be explained and confirmed in writing before shipment. Ask for the full ordering code and revision for your engineer to review.

Customer reviewing GE turbine control cards with the EWOLO team
Case lead ·Claire Zhang
CUSTOMER CASE

A closer look at GE turbine cards

A customer from Dubai met our team to review card identification, revision and visible condition before purchase. See which details they checked together.

Looking for a part?

Search our automation parts catalogue using the full manufacturer part number, including its suffix.

Can't read the part number? Send a nameplate photo

Ask the EWOLO team

Whether you need advice or help finding the right part, our team is available to assist and keep your operations running smoothly.

unity@mvme.cn
+86 18020776786Call our parts team in Xiamen

Request a quote

Have a part number?
Let us check it.

Send the exact model and quantity, plus a nameplate photo or parts list if available.

Dedicated RFQ contact
Sandy Lin Sales & General Manager

Send the complete model and quantity for review.

What happens next

  1. Email confirmation
  2. Requirement review
  3. Written quotation

Send your requirement

Fields marked * are required.

No online payment is requested. Final price and terms are supplied in a written quotation.

leave a message

No online payment is requested. Final price and terms are supplied in a written quotation.